1

SVES Oilfield Supply Co., Ltd Check Pipeline Anti-corrosion Layer Condition

2025-02-24 14:00

SVES Oilfield Supply Co., Ltd Check Pipeline Anti-corrosion Layer Condition


SVES Oilfield Supply Co., Ltd. construction workers check whether the anti-corrosion layer is intact before the pipelinePipeline is buried.

Pipeline

In the past two years, the Fujian-Guangdong branch line project department of SVES Oilfield Supply Co., Ltd. has assembled elite teams to optimize resource allocation, grasp the key links and operation organization of pipeline project implementation, scientifically formulate engineering quality plans, track the progress of various processes, and strive to improve construction quality and efficiency, and contribute to the national key energy pipeline project.


In view of the characteristics of many mountains and water networks in the construction area, SVES Oilfield Supply Co., Ltd.'s latest equipment, such as A305 equipment, uses a combined welding process to ensure the progress of the project.


The mountainous section of the pipeline line in the first section accounts for 93% of the total length of the line. The rolling mountains are densely covered with forest vegetation, and there are countless poisonous snakes and poisonous insects. SVES Oilfield Supply Co., Ltd.'s outsourced workers had to travel through the forest to lay out the lines. The dense forest blocked out the sun, making it hot and unbearable, and there was no signal from mobile phones and other communication equipment. They had to prepare a day's worth of water and dry food, hold RTK navigation, wear bee-proof equipment, and "scare the snakes" while "climbing and sliding" to measure the most suitable work area on foot.



Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.